Development, Design & Build
Soluna, Applied Digital plan 50MW AI data centre in Texas, US
The development will be co-located with the 150MW Briscoe Wind farm, alongside Dorothy 1 and Dorothy 2 sites.
The development will be co-located with the 150MW Briscoe Wind farm, alongside Dorothy 1 and Dorothy 2 sites.